Reconstruction of bridge swept by flooded river expedited in Dhading

Above Article Ad
Above Article Ad

DHADING: Reconstruction of a bridge over Mauwa River along the Prithvi Highway located in Dhading district has been expedited.

The bridge, which stands near the border with Chitwan district and connects Kathmandu with 67 districts in the country, was swept away by flood triggered by incessant rain on Monday.

Movement along the highway has come to a halt after the part of concrete bridge was swept away on Dhading side. Meanwhile, the stakeholders concerned have been actively carrying out reconstruction of the bridge.

Article inline ad #1

The landslides and floods triggered by incessant rainfall have been reported to have wreaked havoc causing heavy damages to the infrastructures in various parts of the country with the monsoon season in full swing. THT

Workers building gabions on the Mauwa River bed in Dhading district on Wednesday, July 23, 2020. The part of the bridge over Mauwa River was swept away by flood on July 20. Photo: Keshav Adikari/THT

 

Below Article Content Ad
Below Article Ad

Leave a Reply

Below Comments Ad
Back to top button